| 1 |
SR/MS0002Q |
ALL MAPLE
STAIR+SPEC’D RAILS
Upgrade Main Stairs to ALL MAPLE (veneer stringer, veneer riser, maple
treads) and SPECIFIED Rail and Pickets to ‘Maple, Natural Finish. Carpet
runner if required to be ordered separately. Staining or painting of maple
to be ordered separately SPECIFY RAILING TYPE AND PICKET SIZE IN ROOM
SCREEN. Includes ANY maple strip flooring On stair landings to second
floor, and std- ceramic tile on stair landings to basement where
applicable. Any changes to landing flooring will be ordered separately.
[Room Notes: R3C Rail w/ 1 5/16 picket. |
1.00 |
$2432.00 |
| 2 |
EL/MS00021
|
EXTRA
INT.LIGBT & SWITCH
Add an additional Standard Interior Light & Switch. Drawing with location
required. [Room Notes: Living Room. Install Switch beside existing
switches. See Sketch.] |
1.00 |
$208.65 |
| 3 |
KC/C20Ul50
|
UPPER ANGLED
CORNER CABINET
Install upper angled corner cabinet as per attached plan. Bulkhead layout
will change to suit cabinet. Room Notes: ultra 1) |
1.00 |
$296.00 |
| 4 |
I{V/MSOO11O
|
ADD’L GAS
ROUGH-IN-GROUND FLR
Additional Capped Gas line for future Gas Appliance on the ground floor or
exterior. Electrical Outlet Included. Appliance connection is not
included. HV/MSOO100 must be ordered with this upgrade. This Extra
is to be charged for each Natural Gas Appliance added. [Room Notes: For
SEQ. See sketch.] |
1.00 |
$359.52 |
| 5 |
HV/MS00l00
|
INCREASE
3/4” GAS LINE TO 1”
Increase Size of Gas Line in the House from stnd 3/4” to 1”. A 3/4”
line is suitable for a furnace, hot water tank and one other appliance
(SEQ. oven or fireplace) . Any additional appliances in the house require
this upgrade. |
1.00 |
$155.15 |
| 6 |
TR/2003000
|
SMOOTH
CEILINGS- 1ST FLR ONLY
Install a smooth ceiling finish in lieu of stipple on the ground floor
ceiling, including vaulted or cathedral ceilings at the ground floor
ceiling level. Does not apply to “open to above” areas of the ground
floor. Ceiling height ‘nay be slightly reduced in rooms where trusses for
vaulted/cathedral ceilings occur over the ground floor. Ceiling is painted
standard ceiling white. |
1.00 |
$963.00 |
| 7 |
HV/MS00320
|
AIR COND’S
1751 to 2300 SQ.FT.
Install complete Central Air Conditioning. Air conditioning unit will be
located to suit site conditions and the requirements of authorities having
jurisdiction. (Note: Installation of Air Conditioning by Purchasers
contractor will void warranty work where the warranty issue is related to
the installation of the air conditioner) |
1.00 |
$2,568.00 |
| 8 |
PI,/SK10002
|
72X42 SOAKER
IN LIEU OF 60X42
Install a Mirolin 72x42 (P742) in lieu of the standard Mirolin 60x42
(P642) soaker. Any other upgrades to soaker will he ordered separately.
This option is not available on all models. Approval req’d from Head
Office. [Room Notes Master Ensuite] |
1.00 |
$642.00 |
| 9 |
PL/SKl0025
|
UPG WHIRLP’L
JETS-BRASS/CHRO
In the specified bathroom, upgrade the WHIRLPOOL jets and fittings to the
SPECIFIED brass or chrome. [Room Notes: Master Ensuite. Chrome Jets] |
1.00 |
$267.50 |
| 10 |
PL/SK1002O
|
EJPC SOAXER
TO WHIRLPOOL
Upgrade soaker tub to standard whirlpool, with 6 jets. Specify bathroom.
Specify colour of jets bone/white/grey/biscuit. Upgrade to chrome or brass
jets ordered separately. Room Notes: Master Ensuite] |
1.00 |
$1,658.50 |
| 11 |
PI,/SH0001O
|
ADD SHOWER
DOORCHRONE OBSCURE
Add Shower Door (Chrome Frame/Obscure Class) to Ceramic Shower. Specify
bathroom. [Room Notes: Master Ensuite] |
1.00 |
$410.88 |
| 12 |
TR/AC-DLET
|
DELETE ALL
CERAMIC BATH ACCESS
Delete all ceramic bathroom accessories (towel bar, paper holder and soap
dish where applicable) in the specified bathroom. Wall tile will be
installed complete where soap dish accessories are deleted. [Room Notes:
Powder room, Master Ensuite. and Main Bathroom] |
1.00 |
$0.00 |
| 13 |
TR/1033000
|
CL. SL. BRD
TO WHT FRN <6’
To install Clear Mirror Sliders with Bright White Frames in lieu of board
closet sliders. For closets less than 6’ wide. [Room Notes: Bedroom 21
|
1.00 |
$165.85 |
| 14 |
EL/MS00490
|
CONDUIT FROM
BSMT TO ATTIC
Install nominal 2 1/4” ABS conduit from basement ceiling space to main
attic space for future wiring rough in by purchaser. Conduit will be
capped on both ends to comply with municipal authorities having
jurisdiction. Location will be determined by site staff to suit site
conditions. |
1.00 |
$315.65 |
| 15 |
EL/M500l15 |
EXTEND STD CVAC R/I TO GARAGE 1.00
Extend basic central vac rough in (either purchased separately or included
standard with house), to accommodate purchasers installation of central
vac after closing. Rough in all central vac pipes, completely extending
all runs to the garage, with only one central vac outlet in the basement
(no hinged cover plate) installed on a steel post or on wall . Includes
electrical outlet in garage only.
THIS ITEM IS NOT REQUIRED WHEN COMPLETED CENTRAL VAC (EL/MS00120.
EL/MSOOI21) IS ORDERED |
1.00 |
$235.40 |
| 16 |
PL/PKDLDO2 |
‘NEW DELTA PKG D-NO KIT TWO
Install DELTA FAUCETS PACKAGE D faucets to all bathroom.
SPECIFY NUMBER OF BATHS AS PER PRICING CHART. This package does not
include changes to the kitchen faucet. All bathroom sink faucets are
upgraded to 2577LHP-H215. Steel tub/shower stalls other than master
ensuite are upgraded to 1448-rHP H715. Hand showers for showers/tubs or
soaker tubs (where not part of package) are ordered separately. [Room
Notes:2 1/2 bathroom with soaker tub.] |
1.00 |
$2,326.61 |
| 17 |
Custom |
CUSTOM
Install R-13 batt insulation to interior walls in bedroom # 2 and bedroom
4 3. |
1.00 |
-NIP- |
| 18 |
KC/STD-APP |
ALL APPLIANCES IN KIT ARE STD
Purchaser acknowledges no changes are required to cabinet openings for
FREE STANDING STOVE (30 wide), REFRIGERATOR (36 wide x 69” high) AND
DISHWASHER (24 wide) • and that no changes are required to the standard
electrical or plumbing services provided for any of the kitchen
appliances. |
1.00 |
$0.00 |
| 19 |
? |
CERAMIC TILE TO REPLACE CARPET
For Kitchen and Powder room to have same basic tile as Foyer. |
|
$2153.00 |